Preliminary source. The official November 2022 report names this exact parcel for total acquisition, and the county owner record was refreshed on 2026-08-16. Current title, representation, conflicts, and acquisition status must still be checked before use.
01

Start with the opportunity

Project context

FDOT project
430573-4
County
Pasco
Published phase
Final PD&E report; related segments 430573-2 and 430573-3 are now in design
Timing
Related design segments remain in design and construction is currently unfunded; this parcel's acquisition status is not confirmed
Next: who owns the parcel
02

Current property information

The county parcel and current owner

No situs address listed; parcel is near 1530 Cypress Creek Road, Lutz, FL 33559

Parcel ID
34-26-19-0000-00100-0060
County owner
KING HENRY LOGAN III
Land use
Grazing soil class 5
Mailing address
1530 CYPRESS CREEK RD, LUTZ, FL 33559-8606
Email address
Not researched for this example
County record date
2026-08-16
Next: inspect the affected portion
03

Official property visual

What the official source shows

Official mapproperty identified in the FDOT report
Not calculatedaffected area or parcel percentage
Two official FDOT concept-plan sheets showing FPC-3B beside a complete current Pasco County diagram of parcel 34-26-19-0000-00100-0060
The official report names the exact county parcel for total acquisition; the two official plan sheets show FPC-3B and the county diagram retains the whole parcel

Do not read this as: a final take, survey measurement, valuation, or promise that acquisition will occur.

This report format identifies the property and supplies an official visual, but it does not support a trustworthy affected-area percentage. The packet leaves that field blank instead of estimating it.

Next: prepare outreach
04

Prepare the communication

Create an editable outreach draft

Control the instructions and format, generate a new draft, and edit the result directly. Nothing is sent from this page.

Sender details for the printed letter

These instructions control tone and structure. The reviewed project and property facts remain fixed.

Review before use: confirm current title, conflicts, representation, current right-of-way evidence, sender information, and applicable advertising requirements.

See official sources and limitations

Official sources

This walkthrough does not claim

  • This is not a title report, survey, appraisal, legal opinion, or acquisition notice.
  • No affected area or parcel percentage is calculated from this report.
  • Current title, representation, conflicts, project status, and acquisition evidence still require review.

Parcel detail complete

Review the evidence and decide whether the property is worth pursuing.

Return to the project page to compare this property with the other available results.

Back to project →